디시인사이드

언어변경
Development project near Gangbuk Seoul Station & Euljiro (excluding Seun
  • 낭만의도시(121.153)
  • 06.21.2024 03:07

1. Near Seoul Station

7cec8175b08360f03fe781fb1cc1231d23bdba665e580f1abbd67d

1) Seoul Station North Station area ( Construction begins in the first half of the 24th/scheduled for completion on the 28th)

5 buildings with a maximum of 38 floors A large-scale project that will establish itself as the COEX of Gangbuk



7cec8173bc8660f03ce883fb01d4262dcb89b1be79dec78eebc35c

2) Millennium Hilton Seoul redevelopment (scheduled for completion on the 27th)

It was initially planned to have 38 floors, but was changed to two 32-story buildings with a maximum height of 142 m for the view of Namsan Mountain (the building in the middle and the thinner building on the right).



7cec8171b4836dfe37ea81fb1cc1231da574f81d3fc7ed3c772c

3) Meritz Fire & Marine Insurance’s new headquarters (completed in April this year)

Up to 20th floor



7cec817ebd846cf73dea84fb1cc1231d5c4b1771107e6791f7e5c7

4) Dongja-dong District 2

Highest 40th floor, 183m


2. Seosomun Gate

7fef8270b08660fe3be985fb06df231d6300a0f30ff7d07dde2025

1) Seoul Station-Seodaemun District 1 and 2 Seosomun Building Redevelopment (scheduled for completion on the 27th)

Concert hall on the 4th to 9th floors of the highest 19th floor (1,200-seat classical concert hall)



7fef827fb0866ff13be987fb1cc1231d3d9781c9eba34023ba903f

2) Redevelopment of the central building in Seosomun districts 11 and 12

Highest 35th floor, 176m



3. Near Euljiro

7eee8374b4876cf03beb82fb1cc1231d3ffe85ec83da3a8a11105a

1) Euljiro 2-ga Shinhan Bank redevelopment



7eee8372b0856df73ae782fb1cc1231da7644ab901d1034fcb8c

2) Eulji Finance Center, District 1 and 2, Euljiro 3-ga (scheduled for completion on the 27th)

Up to 19th floor



7eee8373b38660f139e783fb1cc1231d84b424aa669c85f4972e

3) Euljiro 3-ga District 10

Top 21st floor



7eee8370b08469f136e684fb06df231d9a830e8d0931b9b5d7c3d5

4) Euljiro 3-ga District 12 (26 scheduled to be completed)

Up to 17th floor



7eee8377b0836cf137e985fb1cc1231d04812e6a44a76603ccd816

5) Gongpyeong Districts 15 and 16 (26 scheduled to be completed)

Up to 17th floor



7eee8377b4836ef336e681fb1cc1231d96b420b532b3e4a0d43f8a

6) Euljiro 3-ga checkpoint area











  • 45
  • 0
Sort by :
'Travel galler'The gallery nickname is the recommended nickname in the gallery. (You can enter your nickname directly when deleting it.)
더보기